 |
 |
 |
| Paul Struve of Peoples Insurance sits in his new office which is now open for business. |
|
|
|
|
 |
|
|
 |
 |
| The New Internet Cafe |
|
|
 |
|
|
|
|
 |
 |
 |
| Remodeling of the old building |
|
|
|
|
 |
 |
 |
| Demolition has now begun in the old building. |
|
|
 |
 |
| Moving Day!!! |
|
|
 |
|
|
|
|
 |
 |
 |
| Trying to push up a 1,200 pound computer is not easy. |
|
|
 |
 |
| The new East entrance to the new addition. |
|
|
 |
 |
 |
| The new addition is finally finished!!! |
|
|
|
|
 |
|
|
|
|
 |
 |
 |
| Looking down at the new fireplace and customer waiting area. |
|
|
|
|
 |
|
|
 |
 |
| The check processing and proof room is nearly finished. |
|
|
 |
 |
 |
| The new fireplace and customer waiting area. |
|
|
|
|
 |
 |
 |
| Installing the carpet on the main floor. |
|
|
|
|
 |
|
|
|
|
 |
 |
 |
| The cement is being laid for the new parking lot. |
|
|
 |
 |
| The new drive-up equipment is being installed. |
|
|
 |
|
|
|
|
 |
 |
 |
| Most of the new stone has been laid on the North side of the building. |
|
|
 |
 |
| The newly poured cement for the drive-up windows and ATM. |
|
|
 |
 |
 |
| The roofers are putting some of the last pieces of the roof and soffit up. The roof is now made up of a nice combination of steel and shingles. |
|
|
 |
 |
| The brick and stone have been finished around the new drive up window. |
|
|
 |
 |
 |
| The inside of the building is beginning to take shape as they start framing in the interior walls on the 2nd floor. |
|
|
 |
 |
| Paul Struve had to have his office cut in half in order to make room for the new construction. |
|
|
 |
 |
 |
| Joe Van Tol grills burgers and serves dinner to all the employees and construction workers as a thank you for all of the hard work they have done. |
|
|
 |
 |
| Employees enjoying the burgers. |
|
|
 |
 |
 |
| The cement in front of our building had to be pulled up to trench in an electrical line. They worked very fast because the cement was repaired by the next day. |
|
|
 |
 |
| Gary De Jager directs traffic when they had to tear up the street to move the sewer line. |
|
|
 |
 |
 |
| This is a picture of the trench for the sewer line that runs from the street all the way to the trailer court. The sewer line will also run under the ATM drive-up. |
|
|
 |
 |
| Here is the old drive up window at the bank with all of the brick removed from the building. Eventually this wall will be completely removed. |
|
|
 |
 |
 |
| All of the rafters are up and the building is taking shape. |
|
|
|
|
 |
|
|
 |
 |
| This picture shows the inside of the new building looking to the South. |
|
|
 |
 |
 |
| Lifting the Rafters High into the Air. |
|
|
 |
 |
| Pouring Cement on the 2nd Floor |
|
|
 |
|
|
|
|
 |
|
|
|
|
 |
 |
 |
| Hanging the steel for the new addition |
|
|
|
|
 |
 |
 |
| Pouring the Foundation |
|
|
 |
 |
| Digging the Footings in Cold December Weather |
|
|
 |
 |
 |
| Drive-up is Completely Removed |
|
|
 |
 |
| Demolition of the Drive-Up Lanes |
|
|
 |
|
|
|
|
 |
|
|
|
|
 |
 |
 |
| First Scoop of Dirt |
|
|
 |
 |
| Outside Before Construction |
|
|
 |
 |
 |
| This is the temporary drive-up and night drop during the construction process. |
|
|
 |
 |
| Artist Drawing of the Finished Addition |
|
|
 |
 |
 |
| New Floor Plan |
|
|
 |
 |
| This is a picture of the inside of the old building looking to the East. |
|
|
 |
 |
 |
| Looking Northwest |
|
|
 |
 |
| Looking West |
|
|
 |
 |
 |
| Old Teller Windows |
|
|
|
|
 |
 |
 |
| Somebody had some fun playing in the dust created from the demolition. |
|
|
|